1. Round sieve primary screening operation procedure

At any time, the flow rate of the primary screening screen of the Paddy Husker(LIANGGONG) equipment cylinder is observed, and the size of the feeding gate is controlled to ensure that the subsequent process does not drop during the processing and cleaning process. And in time to remove the miscellaneous and straw ropes in the circular sieve.

2. Self-balance vibrating screen operation program

Control the flow rate of the screen surface material, timely remove debris on the screen surface, adjust the air volume of the vertical suction hood, and the spacing of the air selection plate to ensure the best air separation effect of the gettering amount.

3. Go to the stone machine operation program

Adjust the size and flow of the damper to maintain the thickness of the material of the stone machine to ensure the best stone removal effect. In the operation of adjusting the damper should be gradually increased, can not be increased, so as not to be sucked away by the wind.

4. Always check if the pulse dust collector controller is working properly.

If the air pump is running normally, check whether the air outlet of the fan is dusty. If there is dust, check whether the bag in the pulse dust collector is detached or perforated. Find problems and deal with them in time.

Click Paddy Separator to learn about more information.


Share:
Previous post     
     Next post
     Blog home

The Wall

No comments
You need to sign in to comment

Post

By lianggong
Added Dec 12 '18

Tags

Rate

Your rate:
Total: (0 rates)

Archives

advertisement